CENTENNIAL COLLEGE STUDENT CENTRE
Centennial College Ashtonbee Campus Renewal was a major commitment by the college to modernize and expand their existing facilities by adding a new 48,500 sq. ft. Student Centre and the addition of a second floor to the existing gym. Stampa Steel Erectors Ltd. scope was to install structural steel and shoring for the project.
Project Highlights:
- Erecting and maintaining the elevation for a 120ft cantilevered Truss along building Façade.
- Providing a high grade of AESS welding on all round HSS web member splices exposed to view.
- Close cooperation with General Contractor/trades in overcoming design issues and working together within a relatively small area.
Date:
2013General Contractor:
ELLISDONSteel Fabricator:
Benson SteelApprox. Tonnage:
520 tonsLocation:
Toronto, Ont.Category:
Date: