NIAGARA OUTLET MALL PHASE 1
Phase 1 of the Niagara Outlet Mall was composed buildings 500, 600, & 700 totaling 1500 tons of structural steel and OWSJ. Stampa Steel was tasked with the erection of all structural steel and OWSJ within the client’s aggressive schedule. Stampa Steel Ltd is proud to state through hard work and co-operation with the client, the project was completed well within the clients schedule.
Date:
2013General Contractor:
PCL CONSTRUCTION LTDSteel Fabricator:
Benson SteelNiagara Steel Ltd.Approx. Tonnage:
1500 tonsLocation:
Niagara-on-the-lake, Ont.Category: